top of page

What Happens Next Under MassDEP

Environmental Oversight, Developer Responsibilities, and Construction Timing

Last updated: November 14, 2026

Why this matters

Environmental contamination, including vinyl chloride and dichloroethene, has been reported at the PB-412 development property (MassDEP RTN 3-0054104).

 

A November 11, 2026 filing provides additional information about soil and groundwater testing performed in April 2026. Further investigation is underway.

 

The developer has attributed the contamination to migration from the neighboring 445 Concord Avenue disposal site (RTN 3-0000959).

 

However, the source, extent, and potential migration pathways have not been independently established in the materials reviewed by residents.

 

Important: The available findings do not establish that nearby residents or schoolchildren have been exposed or that a current health hazard exists.

 

MassDEP oversees environmental assessment and response under the Massachusetts Contingency Plan (MCP). Cambridge separately administers applicable land-use, demolition, construction, and public-way permits.

What has happened so far?

May 20, 2026 — Reported date of knowledge

The original MassDEP release notification identifies this as the date of knowledge of the reported condition.

 

September 17, 2026 — Release Notification

Contamination was reported to MassDEP under RTN 3-54104. The original filing identifies vinyl chloride and 1,2-dichloroethene and classifies the notification under the 120-day reporting provisions.

 

October 6, 2026 — Planning Board Vote

The Cambridge Planning Board voted to approve the revised residential development.

 

October 8, 2026 — Developer Communication

BSR Birch LLC stated that environmental sampling indicated contamination had migrated from 445 Concord Avenue and announced plans to prepare a Downgradient Property Status submission.

 

October 19, 2026 — Amended Environmental Filing

An amendment to the original environmental notification was identified in the records reviewed by residents. The exact changes should be confirmed against the amended filing.

 

October 30, 2026 — MassDEP Notice of Responsibility

A Notice of Responsibility has been reported for BSR Birch LLC in connection with the PB-412 environmental release.

The original notice should be reviewed to determine any specific requirements, directives, or deadlines.

​

November 9, 2026 — Additional Environmental Investigation

MassDEP confirmed that additional soil borings and groundwater monitoring wells were installed during the week of November 2, with further sampling planned.

​

November 9, 2026 — Planning Board Decision Filed

The Cambridge City Clerk's Office and Community Development Department confirmed filing of the written PB-412 approval decision. Residents are seeking clarification of its conditions and subsequent permitting requirements.

​

November 11, 2026 — Soil and Groundwater Testing Submitted

BSR Birch LLC submitted a "Summary of Soil and Groundwater Testing" to MassDEP.

 

The supporting materials contain testing performed in April 2026, including:

  • Groundwater vinyl chloride of 0.051 mg/L at B-101 and 0.019 mg/L at B-102, compared with the report's listed RCGW-2 reporting concentration of 0.002 mg/L.

  • Vinyl chloride of 0.32 mg/kg in a soil sample collected 14–16 feet below ground, compared with the listed RCS-1 reporting concentration of 0.3 mg/kg.

  • Groundwater observed approximately 6–7 feet below the surface at two monitoring locations.

 

These findings provide information relevant to further investigation and construction planning.

 

Exceeding a reporting concentration does not itself establish exposure, health risk, or the cleanup measures required.

 

The November 11 filing does not contain the results from the additional November sampling.

What happens next?

1. Additional Testing and Groundwater Assessment
Additional investigation is expected to help clarify the distribution of contaminants and groundwater conditions.


Residents are requesting:

  • Results from the November borings and monitoring wells.

  • Updated sampling-location and groundwater-flow maps.

  • Information about potential migration pathways.

  • Clarification of whether McPhail Associates and Haley & Aldrich are coordinating their respective investigations at PB-412 and 445 Concord Avenue.


Further drilling and groundwater monitoring on the Birch Street side have also been discussed. Residents are seeking clarification about proposed locations, permit applications, and the anticipated testing schedule.


2. December 2026 — Anticipated Downgradient Property Status Submission
The developer previously indicated that its environmental consultant, McPhail Associates, expected to submit documentation supporting
Downgradient Property Status (DPS).


DPS is available under specified Massachusetts regulations when contamination has migrated onto a property from an upgradient or upstream source.


A DPS submission must include a supporting Licensed Site Professional opinion and appropriate technical evidence, including an evaluation of relevant groundwater conditions where groundwater migration is involved.


A proposed DPS submission does not establish that the neighboring property is the source or that the submission meets regulatory requirements.


Notification of Certain Abutting Property Owners


Under 310 CMR 40.0183(5), copies of a DPS Opinion must be provided to specified upgradient and downgradient abutting property owners and operators and certain other parties.


Residents are asking which neighboring properties would qualify for notice and how and when that notice would be provided.


DPS may change certain future regulatory deadlines and obligations when properly established and maintained. It does not eliminate applicable immediate response requirements or independently authorize construction.


3. Early 2027 — Proposed Neighborhood Information Meeting

The developer previously indicated plans to hold a neighborhood meeting after the start of the new year.


Residents are requesting earlier access to available environmental testing information, along with a coordinated discussion involving:

  • Relevant Cambridge departments

  • BSR Birch LLC and McPhail Associates

  • Haley & Aldrich, which works on the neighboring 445 Concord Avenue investigation

  • MassDEP, if available


The goal is to understand the investigation, construction-related safeguards, and responsibilities before significant work begins.


Residents are also requesting a separate, accessible neighborhood information session where families, renters, homeowners, and local businesses can ask questions.


4. September 17, 2027 — Phase I Investigation Milestone

MassDEP identified September 17, 2027, as the Phase I Initial Site Investigation reporting deadline associated with the September 2026 release notification, subject to applicable requirements.


Phase I investigation generally addresses the nature and extent of the reported release and evaluates whether additional actions are necessary.


The Phase I deadline is not automatically a construction start date, a prohibition on earlier construction, or evidence that environmental requirements have been satisfied.


Other response obligations may apply earlier depending on the findings and activities proposed.


What Must Be Addressed Before and During Construction?

The November 11 filing is an environmental testing submission. It does not, by itself, constitute construction authorization or establish that a complete construction-related environmental management plan has been submitted.


Depending on the proposed work and applicable requirements, the following issues may need to be addressed.


Demolition and Asbestos- Applicable pre-demolition hazardous-material surveys, asbestos notifications, abatement procedures, demolition permits, and dust-control measures.


Excavation and Groundwater - Planned excavation depths, whether the work could intersect groundwater, and any necessary groundwater treatment, dewatering, or discharge controls.


Contaminated Soil and Vapor- Soil handling and disposal procedures, dust suppression, vapor-related evaluations, monitoring, and other environmental response measures where warranted.


Construction Management and Public Access- Construction truck routes, staging, street and sidewalk access, nearby business access, pedestrian safety, school arrival and dismissal, and advance neighborhood notification.


City and State Coordination- Clarification of responsibilities among MassDEP, Cambridge Community Development, Public Works, Inspectional Services, Public Health, and the developer's environmental professionals.


The measures actually required will depend on the project's activities, environmental findings, and applicable laws and permit conditions.


Questions We Are Asking

  1. When will the November sampling results and updated groundwater information become publicly available?

  2. What evidence supports the proposed contamination source and potential DPS submission?

  3. Which neighboring property owners would receive DPS-related notices?

  4. Are any Immediate Response Actions or Release Abatement Measures anticipated, and what public involvement procedures may apply?

  5. Could planned excavation reach groundwater, and how would any necessary dewatering be managed?

  6. What demolition, asbestos, soil, groundwater, dust, and vapor safeguards will apply?

  7. What is the status of proposed additional Birch Street drilling and any required City permits?

  8. Who will coordinate environmental and construction-related questions among City departments, MassDEP, the developer, and the LSPs?

  9. When will residents, local businesses, schools, and childcare facilities receive construction schedules, traffic plans, and advance notices?

  10. Can a coordinated technical discussion and neighborhood information session be held before significant soil-disturbing work begins?

Our position

Responsible Cambridge Development supports additional housing alongside environmental transparency, appropriate construction safeguards, and meaningful neighborhood participation.

​

Reported contamination does not establish that nearby residents have been exposed.

​

We are seeking accurate information about the ongoing investigation, applicable protections, and how residents will be kept informed as redevelopment proceeds.

bottom of page