PB-412 | Environmental Findings
APRIL 2026 SAMPLING • FILED WITH MASSDEP NOVEMBER 11, 2026 • RTN
What was filed
On November 11, 2026, BSR Birch LLC submitted a BWSC-126 form described as a “Summary of Soil and Groundwater Testing” and supporting McPhail Associates materials. The attached analytical tables report samples collected in April 2026; they do not include laboratory results from newer November drilling and monitoring work reported by MassDEP.
Reported concentrations
Sample / medium | Measured result | Listed reporting concentration |
B-101 groundwater — vinyl chloride | 0.051 mg/L | 0.002 mg/L (RCGW-2) |
B-102 groundwater — vinyl chloride | 0.019 mg/L | 0.002 mg/L (RCGW-2) |
B-102 soil, 14–16 ft — vinyl chloride | 0.32 mg/kg | 0.3 mg/kg (RCS-1) |
Groundwater was observed about 6–7 feet below ground surface at the two April monitoring locations. The measured concentrations are comparisons with reportable concentrations—not determinations of human exposure, risk, or cleanup requirements.

What these findings do not establish
They do not establish that neighboring residents or schoolchildren have been exposed.
They do not determine the contamination source, the full extent of groundwater impacts, or a migration pathway from 445 Concord Avenue.
They do not confirm whether excavation will reach groundwater, whether dewatering will be required, or which construction-stage response plans will apply.
The November 11 materials are not the newer November sampling results or a completed Phase II/III assessment narrative.
Questions residents are asking
When will the November soil and groundwater results, updated well map, and groundwater-flow information be published?
What are the planned excavation depths and any groundwater treatment/discharge arrangements?
What soil, dust, vapor, and groundwater monitoring or management measures will be in place during construction?
How will McPhail, Haley & Aldrich, MassDEP, and Cambridge departments coordinate and share information?
Primary records
Prepared by Responsible Cambridge Development • November 14, 2026 • neighbors@responsiblecambridgedevelopment.org